Index basket position manager

Basket management with a break-even move at a fixed threshold, staged profit exits and basket trailing, consistent with prop account rules.

MT5 Prop trader Amirhossein Taheri Prop index trader

Project specifications

Project specifications

Market
US30 / NAS100
TF
M15
Platform
MT5
Client type
Prop trader
Delivery window
7 weeks
Stack
MQL5, M5 and M15 data, a basket panel
Strategy
Index basket + break-even moves
Modules
Staged exit + basket trailing
Testing
Two-year test across both indices

Who this was for

Amirhossein Taheri

Role
Prop index trader
City
Mashhad
Project reference
TBT-1403-09
Trade flow

The client's idea

Amirhossein Taheri works US30 / NAS100 on M15; the opening brief was: Manage the open US30 and NAS100 positions as one basket, not one by one.

Initial challenge

The two indices are highly correlated; managing positions separately left both open through every reversal.

Solution

Basket management with a break-even move at a fixed threshold, staged profit exits and basket trailing, consistent with prop account rules.

Why this design

The break-even move is calculated from the basket's profit rather than a single position's. It matches how US30 / NAS100 is actually traded and can be tested against the data already available.

Safeguards and risk control

Every change starts from a saved backup, and the previous behaviour is kept as the test reference.

Our next-step proposal

The next step is a full technical review of the expert and clearing the old code's debts.

Portfolio

Measured results

These are the figures the test produced — not a promise about future performance.

  • 4 Concurrent position cap
  • 620 Trades reviewed
  • 8.1 % Max drawdown in test
  • 2 Symbols covered

Portfolio

How the delivery ran

Every project moves through these five phases, with the window for each agreed in the specification.

  1. Discovery and problem framing

    Completed

    Auditing the existing code, finding the cause of the fault and fixing the change scope on US30 / NAS100.

    Day 1–3

  2. Written specification

    Completed

    A written list of approved changes — and of what stays untouched at this stage.

    Day 4–11

  3. Implementation

    Completed

    Applying small, reviewable changes instead of needlessly rewriting healthy parts.

    Day 12–29

  4. Testing and validation

    Completed

    Regression testing the old behaviour and targeted testing of what had to change.

    Day 30–41

  5. Handover and support

    Completed

    Handover of the fixed build with a change report and the reason behind each change.

    Day 42–45